RMF

In terms of railway operations and safety, it is important that the corrugation of rails under operation are within the standard limits of EN 13231-3. In order for track grinding work to be planned and accepted, corrugation measurements and evaluations should be conducted with RMF trolley and reported. To this end, our staff were given a two-day office and field training in December 2018 by visiting experts from abroad.