COMPLETED

IZMIR METRO
Fahrettin Altay - Üçkuyular Line Superstructure Construction

Izmir Metropolitan Municipality
Öztaş Construction
Panoray Railway
Construction Contracting Industry Trade Ltd. Co. 

2010 - 2014

Izmir Light Rail System
2nd Phase Metro Works
Superstructure Construction

SOMA SAVAŞTEPE MACHINE REPAIR
Ballast Tamper, Tamping, Butt Welding, Alumina Thermite Welding

TCDD 3rd REGIONAL DIRECTORATE

■ 28.5 KM machine Ballast Screening
■ Ballast Supply
■ Machine tool repair
■ Machine welding

100 PCS SWITCH MAINTENANCE WORK

TCDD 3rd REGIONAL DIRECTORATE

■ Geometric measurements of switches

■ Performing non-destructive inspection

(Ultrasound and Eddy Current)

■ Correction of geometries.

■ Grinding Operations in Rails and Crossings.

■ Fillet welding (in compliance with WPS)
.

■ Construction of isolated rails

1,100 KM RAILWAY LINE ULTRASONIC INSPECTION WORK

TCDD 3rd REGIONAL DIRECTORATE 

■ Ultrasonic inspections of the 1,100 km line according to EN 16729 standard with the railway vehicle which can be measured with 10 km/h measurement speed and their manual verification